Energy Glossary
Energy Glossary
All
Technology
Operations
Engineering
Data Management
Connection
The process of adding a new joint of drill pipe to the drill string.
Collision Avoidance
Real-time monitoring and corrective actions to maintain safe separation between wellbores.
Casing
Steel pipe installed in the well to stabilize the borehole and isolate formations.
Cementing
Pumping cement into the annulus to secure casing and isolate formations.
Conductor Casing
The first casing set near the surface.
Connection
The process of adding a new joint of drill pipe to the drill string.
Collision Avoidance
Real-time monitoring and corrective actions to maintain safe separation between wellbores.
Casing
Steel pipe installed in the well to stabilize the borehole and isolate formations.
Cementing
Pumping cement into the annulus to secure casing and isolate formations.
Conductor Casing
The first casing set near the surface.

